Product images are provided for visual reference. Please confirm the final configuration and specifications with our team.
Industrial Testing Equipment
GROADA-AC480V-86KW-RLC RLC Load Bank Manufacturer
Explore product details and technical information, or send us your requirements for application guidance and a quotation.
Request Product Information
Tell us what you need. Our team can follow up with product details and quotation information.
Product Overview & Technical Specifications
| Model | AC220V-10KVA-RLC | AC380V-30KVA-RLC | AC380V-60KVA-RLC | AC380V-100KVA-RLC | AC380V-200KVA-RLC | AC380V-300KVA-RLC |
| Rated power | RLC=10KVA | RLC=30KVA | RLC=60KVA | RLC=100KVA | RLC=200KVA | RLC=300KVA |
| R=10KW;L=10KVA C=10KVA | R=30KW;L=30KVA; C=30KVA | R=60KW;L=60KVA; C=60KVA | R=100KW;L=100KVA; C=100KVA | R=200KW;L=200KVA; C=200KVA | R=300KW;L=300KVA; C=300KVA | |
| Other power can be customized according to requirements | ||||||
| Size (width * depth * height mm) | 500*750*1400 | 600*850*1500 | 1000*1100*1500 | 1100*1600*1500 | 1500*1800*1800 | 2000*2000*2000 |
| Weight | 120KG | 380KG | 580KG | 880KG | 1500KG | 2500KG |
| Input voltage | AC220/230V | AC380/400V | ||||
| Other input voltage can be customized according to requirements | ||||||
| Input current | 0-45A | 0-45A | 0-90A | 0-150A | 0-300A | 0-450A |
| Minimum loading | R=100W;L=100VA; C=100VA | R=100W;L=100VA; C=100VA | R=100W;L=100VA; C=100VA | R=100W;L=100VA; C=100VA | R=1KW;L=1KVA; C=1KVA | R=1KW;L=1KVA; C=1KVA |
| Other minimum loading power can be customized according to requirements | ||||||
| power factor | PF = 0.1~1.0 (other power factor can be customized according to requirements) | |||||
| Overall accuracy | 3% (other accuracy requirements can be customized according to requirements) | |||||
| Control mode | Local manual/remote host computer (local manual control mode: circuit breaker/button/touch screen three-way optional, other methods can be customized as required) | |||||
| Remote Interface | RS232/RS485/USB/RJ45/CAN/GPIB (other interface modes can be customized according to requirements) | |||||
| Protection function | Emergency stop protection, over-temperature protection, fan load interlock protection, grounding protection (select over-voltage protection, over-current protection, short-circuit protection, fan overload, insufficient air volume) | |||||
| Working power supply | AC220V | AC220V/380V | AC380V | |||
| Display accuracy | 0.5 level (other explicit precision can be customized according to requirements) | |||||
| Display parameters | Voltage, current, power, frequency, power factor, etc. (other explicit methods can be customized according to requirements) | |||||
| Cold sure way | Side air inlet and upper air outlet (other air outlet methods can be customized according to requirements) | |||||
| Protection level | IP20 (other protection level can be customized according to requirements) | |||||
| Appearance color | RAL7035 (other colors can be customized according to requirements) | |||||
| Working temperature | -10 ℃ ~ 55 ℃ | |||||
| Relative humidity | ≤95%RH | |||||
| Altitude | ≤ 2500 m | |||||
GROADA AC480V-86KW RLC Load Bank – Advanced Three-Phase Power Testing Solution
The GROADA AC480V-86KW RLC Load Bank is a high-precision testing instrument designed for comprehensive simulation of resistive, inductive, and capacitive loads in modern electrical systems. Engineered for performance, durability, and flexibility, this load bank is ideal for power stations, industrial facilities, data centers, and renewable energy testing environments.
Key Specifications
-
Rated Power: 86 kW
-
Voltage: AC 480V, Three-Phase
-
Frequency: 50/60 Hz
-
Power Factor Range: Adjustable from 0.1 to 1.0
-
Load Steps: Minimum 100W resistive, 100VAR reactive
-
Control Options: Local touch-screen control and remote monitoring via computer
-
Cooling System: Forced air with high-efficiency fans
-
Protection Features: Overload, overtemperature, and fan failure protection
Core Features
1. Full RLC Load Simulation
The combination of resistive, inductive, and capacitive elements allows the AC480V-86KW RLC Load Bank to accurately replicate real-world electrical loads. This ensures that generators, UPS systems, and switchgear can be tested under realistic operational conditions.
2. Precision Control and Monitoring
Equipped with an advanced digital control system, operators can adjust loads precisely and monitor performance metrics in real-time. Remote access enables integration into automated test setups, improving efficiency and reducing testing errors.
3. Modular and Scalable Design
Designed with scalability in mind, the load bank can be expanded or reconfigured to meet growing testing requirements, making it a long-term solution for evolving facilities.
4. Comprehensive Protection
Integrated safety mechanisms protect the equipment from overloads, overheating, and fan failure. This ensures the longevity of the load bank and the safety of connected electrical systems.
Applications
-
Data Centers: Verify backup generators and UPS systems for uninterrupted power delivery.
-
Power Stations: Test generator performance across varying load conditions.
-
Renewable Energy Systems: Simulate grid integration for solar, wind, and hybrid energy systems.
-
Industrial Facilities: Evaluate electrical infrastructure and optimize performance reliability.
Why Choose GROADA AC480V-86KW RLC Load Bank?
The GROADA AC480V-86KW RLC Load Bank provides unmatched accuracy, versatility, and safety in load testing applications. By simulating realistic electrical loads, it ensures that power systems operate reliably under any condition. With its advanced control interface, modular design, and robust protection features, this load bank is a critical tool for engineers and facility managers who demand high-quality, dependable, and efficient testing solutions.
Industry Insights
The global load bank market continues to grow due to increasing demand for reliable power systems in industrial, commercial, and renewable energy sectors. Facilities that integrate advanced RLC load testing can enhance operational resilience, reduce downtime, and extend the lifespan of electrical equipment.