RLC Load Bank

GROADA-AC415V-24.3KW-RLC three-phase load cabinet

★★★★★
Main Products:
  • AC Load Bank : R / RL / RLC / RCD
  • DC Load Bank : DC5V - 2000V, 0A - 5000A


ModelAC220V-10KVA-RLCAC380V-30KVA-RLCAC380V-60KVA-RLCAC380V-100KVA-RLCAC380V-200KVA-RLCAC380V-300KVA-RLC
Rated powerRLC=10KVARLC=30KVARLC=60KVARLC=100KVARLC=200KVARLC=300KVA
R=10KW;L=10KVA
C=10KVA
R=30KW;L=30KVA;
C=30KVA
R=60KW;L=60KVA;
C=60KVA
R=100KW;L=100KVA;
C=100KVA
R=200KW;L=200KVA;
C=200KVA
R=300KW;L=300KVA;
C=300KVA
Other power can be customized according to requirements
Size (width * depth * height mm)500*750*1400600*850*15001000*1100*15001100*1600*15001500*1800*18002000*2000*2000
Weight120KG380KG580KG880KG1500KG2500KG
Input voltageAC220/230VAC380/400V
Other input voltage can be customized according to requirements
Input current0-45A0-45A0-90A0-150A0-300A0-450A
Minimum loadingR=100W;L=100VA;
C=100VA
R=100W;L=100VA;
C=100VA
R=100W;L=100VA;
C=100VA
R=100W;L=100VA;
C=100VA
R=1KW;L=1KVA;
C=1KVA
R=1KW;L=1KVA;
C=1KVA
Other minimum loading power can be customized according to requirements
power factorPF = 0.1~1.0 (other power factor can be customized according to requirements)
Overall accuracy3% (other accuracy requirements can be customized according to requirements)
Control modeLocal manual/remote host computer (local manual control mode: circuit breaker/button/touch screen three-way optional, other methods can be customized as required)
Remote InterfaceRS232/RS485/USB/RJ45/CAN/GPIB (other interface modes can be customized according to requirements)
Protection functionEmergency stop protection, over-temperature protection, fan load interlock protection, grounding protection (select over-voltage protection, over-current protection, short-circuit protection, fan overload, insufficient air volume)
Working power supplyAC220VAC220V/380VAC380V
Display accuracy0.5 level (other explicit precision can be customized according to requirements)
Display parametersVoltage, current, power, frequency, power factor, etc. (other explicit methods can be customized according to requirements)
Cold sure waySide air inlet and upper air outlet (other air outlet methods can be customized according to requirements)
Protection levelIP20 (other protection level can be customized according to requirements)
Appearance colorRAL7035 (other colors can be customized according to requirements)
Working temperature-10 ℃ ~ 55 ℃
Relative humidity≤95%RH
Altitude≤ 2500 m


GROADA RLC Load Bank – Advanced Electrical Load Testing Solution

Introduction: Precision Testing for Modern Power Systems

The GROADA RLC Load Bank is a cutting-edge solution designed for rigorous testing of electrical power systems. By accurately simulating resistive (R), inductive (L), and capacitive (C) loads, this load bank provides a realistic representation of real-world operating conditions. It is an essential tool for engineers, technicians, and facility managers seeking to ensure the reliability, efficiency, and safety of generators, UPS systems, and other critical power equipment.

In today’s fast-evolving energy landscape, where renewable integration, critical infrastructure, and industrial automation demand stable and reliable electricity, the GROADA RLC Load Bank delivers precision, versatility, and compliance with global standards.


Key Features

1. Comprehensive Load Simulation

The GROADA RLC Load Bank can simultaneously apply resistive, inductive, and capacitive loads. This ensures that power systems are tested under conditions that closely mimic real operational environments, including fluctuating loads, harmonics, and varying power factors.

2. Adjustable Power Factor

Modern electrical systems require flexible load testing. The GROADA load bank allows power factor adjustments from 0.1 to 1.0, enabling the evaluation of system performance under lagging, leading, and unity power factors. This is particularly crucial for industrial equipment, UPS systems, and renewable energy sources.

3. Wide Voltage Compatibility

Designed for global applications, the RLC Load Bank supports both single-phase and three-phase AC systems:

  • Single-phase: 120V, 220V, 230V, 240V (50/60Hz)

  • Three-phase: 208V, 380V, 400V, 415V (50/60Hz)

This makes it suitable for international deployments across data centers, industrial plants, and telecommunication facilities.

4. Advanced Measurement and Monitoring

Equipped with high-precision digital meters, the load bank monitors:

  • Voltage and current

  • Active, reactive, and apparent power

  • Power factor

  • Energy consumption

  • Frequency

These real-time measurements allow engineers to make informed decisions and validate system performance accurately.

5. Flexible Control Modes

The GROADA RLC Load Bank offers both local and remote control:

  • Local Operation: Intuitive touchscreen interface for easy load adjustment.

  • Remote Operation: Full computer-based control for monitoring, scheduling, and data logging, improving operational efficiency and safety.

6. High Accuracy and Reliability

  • Resistive load accuracy: ±5%

  • Inductive and capacitive load accuracy: ±10%

These specifications guarantee precise load application, ensuring test results are reliable and reproducible.


Industry Applications

The GROADA RLC Load Bank is widely used across multiple sectors:

Data Centers

Uninterrupted power is critical in data centers. The RLC Load Bank allows operators to test backup generators and UPS systems under full-load conditions, ensuring seamless operation during power outages.

Telecommunications

Telecom facilities depend on emergency power systems for network continuity. The load bank enables rigorous testing of power infrastructure, preventing service interruptions and safeguarding critical communication lines.

Industrial and Manufacturing Facilities

Production lines and heavy machinery rely on stable power. The GROADA load bank evaluates system robustness, identifies weaknesses, and minimizes downtime risks, ultimately protecting operational continuity and revenue.

Military and Aerospace

Mission-critical operations require power systems that perform flawlessly under extreme conditions. The RLC Load Bank validates generators, UPS, and control systems, ensuring readiness in defense and aerospace applications.

Renewable Energy Integration

As solar, wind, and hybrid energy solutions grow in adoption, testing their interaction with grid systems becomes essential. The RLC Load Bank simulates variable loads to evaluate system stability, voltage regulation, and power factor correction.


Compliance with International Standards

The GROADA RLC Load Bank adheres to globally recognized standards:

  • IEEE 1547: Distributed energy resource interconnection and performance testing.

  • IEEE 112.3 & 112.5: UPS performance verification standards.

  • NFPA 110: Emergency and standby power system testing and maintenance.

  • ISO 8528: Reciprocating engine-driven generator testing procedures.

  • IEC 62040: Performance and test requirements for UPS systems.

  • UL 1008: Safety requirements for transfer switches.

These certifications ensure that testing meets regulatory requirements, enabling safe deployment in diverse industries worldwide.


Advantages of Using GROADA RLC Load Bank

1. Enhanced System Reliability

By simulating real operational loads, potential weaknesses in generators, alternators, batteries, and control panels are detected before they cause system failures.

2. Optimized Maintenance

Proactive testing reduces unexpected maintenance costs and extends equipment lifespan by identifying issues early.

3. Operational Continuity

Regular load testing ensures uninterrupted power supply, critical in healthcare, data centers, and telecom facilities.

4. Regulatory Compliance

Meeting ISO, IEEE, NFPA, and UL standards ensures organizations maintain compliance and safety across all operations.

5. Cost Efficiency

By preventing downtime and optimizing power system performance, organizations save on energy costs, maintenance expenses, and emergency repair charges.


Technical Specifications

ParameterSpecification
Load TypeResistive, Inductive, Capacitive
Power Factor0.1 – 1.0 Adjustable
VoltageSingle-phase 120V/220V/230V/240V, Three-phase 208V/380V/400V/415V
Frequency50/60Hz
Measurement Accuracy±5% R, ±10% L/C
ControlLocal touchscreen, Remote computer control
DimensionsCustomizable per model
CoolingForced air or natural convection options
Safety FeaturesOverload protection, emergency stop, thermal sensors

Why Choose GROADA

GROADA has decades of experience in designing and manufacturing load banks trusted by industries worldwide. Our products are:

  • Reliable: Engineered for precision and long-term durability.

  • Flexible: Suitable for a wide range of power systems and international voltage standards.

  • Safe: Compliant with global electrical safety standards.

  • User-Friendly: Advanced digital interface for easy monitoring and control.

Organizations from data centers to military bases rely on GROADA load banks to validate and maintain their electrical systems efficiently.


Conclusion

In an era where uninterrupted power supply is mission-critical, the GROADA RLC Load Bank provides unmatched precision, versatility, and reliability. By simulating realistic electrical loads, it ensures that generators, UPS systems, and industrial power infrastructures operate optimally under any condition.

Elevate your power testing capabilities with GROADA – the professional choice for engineers and organizations that demand accuracy, safety, and performance.

Our Product