GROADA-AC220V-15KW-RLC Load Bank Manufacturer
The GROADA AC220V 15KW RLC Load Bank is engineered to provide comprehensive simulation of real-world...
| Model | AC220V-10KVA-RLC | AC380V-30KVA-RLC | AC380V-60KVA-RLC | AC380V-100KVA-RLC | AC380V-200KVA-RLC | AC380V-300KVA-RLC |
| Rated power | RLC=10KVA | RLC=30KVA | RLC=60KVA | RLC=100KVA | RLC=200KVA | RLC=300KVA |
| R=10KW;L=10KVA C=10KVA | R=30KW;L=30KVA; C=30KVA | R=60KW;L=60KVA; C=60KVA | R=100KW;L=100KVA; C=100KVA | R=200KW;L=200KVA; C=200KVA | R=300KW;L=300KVA; C=300KVA | |
| Other power can be customized according to requirements | ||||||
| Size (width * depth * height mm) | 500*750*1400 | 600*850*1500 | 1000*1100*1500 | 1100*1600*1500 | 1500*1800*1800 | 2000*2000*2000 |
| Weight | 120KG | 380KG | 580KG | 880KG | 1500KG | 2500KG |
| Input voltage | AC220/230V | AC380/400V | ||||
| Other input voltage can be customized according to requirements | ||||||
| Input current | 0-45A | 0-45A | 0-90A | 0-150A | 0-300A | 0-450A |
| Minimum loading | R=100W;L=100VA; C=100VA | R=100W;L=100VA; C=100VA | R=100W;L=100VA; C=100VA | R=100W;L=100VA; C=100VA | R=1KW;L=1KVA; C=1KVA | R=1KW;L=1KVA; C=1KVA |
| Other minimum loading power can be customized according to requirements | ||||||
| power factor | PF = 0.1~1.0 (other power factor can be customized according to requirements) | |||||
| Overall accuracy | 3% (other accuracy requirements can be customized according to requirements) | |||||
| Control mode | Local manual/remote host computer (local manual control mode: circuit breaker/button/touch screen three-way optional, other methods can be customized as required) | |||||
| Remote Interface | RS232/RS485/USB/RJ45/CAN/GPIB (other interface modes can be customized according to requirements) | |||||
| Protection function | Emergency stop protection, over-temperature protection, fan load interlock protection, grounding protection (select over-voltage protection, over-current protection, short-circuit protection, fan overload, insufficient air volume) | |||||
| Working power supply | AC220V | AC220V/380V | AC380V | |||
| Display accuracy | 0.5 level (other explicit precision can be customized according to requirements) | |||||
| Display parameters | Voltage, current, power, frequency, power factor, etc. (other explicit methods can be customized according to requirements) | |||||
| Cold sure way | Side air inlet and upper air outlet (other air outlet methods can be customized according to requirements) | |||||
| Protection level | IP20 (other protection level can be customized according to requirements) | |||||
| Appearance color | RAL7035 (other colors can be customized according to requirements) | |||||
| Working temperature | -10 ℃ ~ 55 ℃ | |||||
| Relative humidity | ≤95%RH | |||||
| Altitude | ≤ 2500 m | |||||
The GROADA-AC415V-6KW-RLC Three-Phase Load Bank is a high-performance testing solution designed to simulate real-world electrical loads on generators, UPS systems, and other critical power infrastructure. Combining resistive (R), inductive (L), and capacitive (C) loads in one unit, this versatile load bank allows engineers to evaluate the performance, efficiency, and reliability of power systems under controlled, adjustable conditions.
This advanced load bank ensures accurate testing of electrical equipment, prevents unexpected downtime, and prolongs equipment lifespan by identifying potential weaknesses before they become operational failures.
The GROADA RLC load bank integrates resistive, inductive, and capacitive loads, allowing precise simulation of complex real-world electrical demands. By adjusting the balance of these components, engineers can replicate diverse operational scenarios, including:
Resistive loads (R): Simulates heating, lighting, and purely resistive devices.
Inductive loads (L): Replicates motors, transformers, and other inductive equipment.
Capacitive loads (C): Tests power factor correction and energy storage components.
This flexibility ensures comprehensive system validation and supports a wide range of testing applications.
The device supports adjustable power factor testing, typically ranging from 0.1 to 1.0, enabling engineers to:
Test the generator or UPS under leading, lagging, and unity power factor conditions.
Analyze system stability and voltage regulation.
Identify potential inefficiencies in energy distribution.
Load Accuracy: ±5% for resistive, ±10% for inductive, and ±5% for capacitive elements.
Precision Control: Fine adjustments ensure realistic simulation of load conditions.
Robust Design: Engineered to operate reliably under continuous and high-load testing scenarios, minimizing risk to both personnel and equipment.
The GROADA-AC415V-6KW-RLC Load Bank is ideal for:
Generator Testing: Simulates full-load conditions to validate output, prevent wet stacking, and ensure long-term reliability.
UPS and Backup Systems: Confirms that UPS units can handle peak loads and maintain critical operations during outages.
Power Quality Analysis: Detects harmonics, voltage fluctuations, and other power disturbances under different load conditions.
Compliance Testing: Meets international standards such as IEEE 1547 and NFPA 110, supporting regulatory and safety compliance.
Enhanced Equipment Longevity: Identifying issues early reduces unexpected failures and extends equipment lifespan.
Operational Efficiency: Accurate load simulation improves system tuning and power management.
Cost-Effective Maintenance: Preventative testing reduces expensive emergency repairs and operational downtime.
Peace of Mind: Ensures critical power systems perform reliably under all operating conditions.
| Parameter | Specification |
|---|---|
| Voltage | 415V AC, three-phase |
| Rated Power | 6KW |
| Load Type | RLC (Resistive, Inductive, Capacitive) |
| Adjustable Power Factor | 0.1–1.0 |
| Load Accuracy | ±5% R / ±10% L / ±5% C |
| Cooling Method | Forced air / fan-cooled |
| Dimensions & Weight | Compact and mobile design for easy deployment |
The GROADA-AC415V-6KW-RLC Three-Phase Load Bank provides engineers and maintenance professionals with a reliable, versatile, and precise tool for testing, validating, and optimizing power systems. Its combination of resistive, inductive, and capacitive loads ensures realistic simulation of operational conditions, helping organizations maintain uptime, reduce maintenance costs, and guarantee system performance.
Investing in a GROADA load bank is a proactive step toward robust, safe, and efficient power management.