GROADA-AC380V-150KW-RL抵抗負荷バンク
The GROADA-AC380V-150KW-RL resistive load bank is a high-performance testing device designed to simu...
| モデル | AC220V-10KVA-RL | AC380 型V-30KVA-RL | AC380 型V-60KVA-RL | AC380 型V-100KVA-RL | AC380 型V-300KVA-RL | AC380 型V-500KVA-RL | AC380 型V-1000KVA-RL |
| 評価パワー | RL=10KVA | RL=30KVA | RL=60KVA | RL=100KVA | RL=300KVA | RL=500KVA | RL=1000KVA |
| R=10KW;L=6KVA | R=30KW;L=18KVA | R=60KW;L=36KVA | R=100KW;L=60KVA | R=300KW;L=180KVA | R=500KW;L=300KVA | R=1000KW;L=600KVA | |
| 入力電流 | 0〜45A | 0〜45A | 0-90A | 0〜150A | 0-450A | 0-750A | 0-1500A |
| サイズ(幅*深さ*高さmm) | 480*600*277 | 480*600*360 | 500*750*1000 | 600*850*1000 | 700*1000*1650 | 1100*1400*1700 | 1100*1500*1900 |
| 重量 | 25キログラム | 40キログラム | 80キログラム | 130キログラム | 250キログラム | 550キログラム | 750キログラム |
| 最小負荷 | 100W | 100W | 100W | 500W | 1KW | 5KW | 10KW |
| 他の最低負荷力は条件に従ってカスタマイズすることができます | |||||||
| 入力電圧 | AC220/230V | AC380/400V | |||||
| 他の入力電圧は条件に従ってカスタマイズできます | |||||||
| パワーファクター | PF = 0.8/1.0(他のパワー要因は条件に応じてカスタマイズすることができます) | ||||||
| 全体的な精度 | 3%(他の正確さの条件は条件に従ってカスタマイズすることができます) | ||||||
| 制御モード | ローカルマニュアル/リモートホストコンピュータ(ローカルマニュアル制御モード:ブレーカー/ボタン/タッチスクリーン三向任意、他の方法は必要に応じてカスタマイズすることができます) | ||||||
| リモートインターフェース | RS232/RS485/USB/RJ45/CAN/GPIB(他のインターフェースモードは条件に応じてカスタマイズすることができます) | ||||||
| 保護機能 | 緊急停止保護,過熱保護,ファン負荷インターロック保護,接地保護 (過電圧保護,過電流保護,短回路保護,ファン過負荷,空気量不足を選択) | ||||||
| 働く電源 | AC220V の | AC220V/380V | AC380V の | ||||
| 表示精度 | 0.5レベル(他の明確な精度は条件に従ってカスタマイズすることができます) | ||||||
| 表示パラメータ | 電圧、電流、力、周波数、パワー要因等 (他の明示的な方法は条件に従ってカスタマイズすることができます) | ||||||
| 冷たい確かな方法 | 側面の空気入口および上の空気出口(他の空気出口方法は条件に応じてカスタマイズすることができます) | ||||||
| 保護レベル | IP20(他の保護レベルは条件に従ってカスタマイズすることができます) | ||||||
| 外観色 | RAL7035(他の色は条件に従ってカスタマイズすることができます) | ||||||
| 作業温度 | -10 ℃ ~ 55 ℃ | ||||||
| 相対湿度 | ≤95%RH | ||||||
| 高さ | ≤ 2500 m | ||||||
「 TheGROADA AC380V 200 kW RL 抵抗反応負荷銀行設計された専門級の試験器です発電機セット、UPSシステム、データセンター、海洋発電システム、および電気調達プロジェクト.
提供する抵抗および誘導負荷シミュレーションの両方 (通常0.8の遅れのパワー要因)、保証包括的で現実的なテスト現実世界の動作条件下の電力システム。
作られた産業級の部品そして高精度測定システムこのユニットは、重要な電力検証のための安定した安全で繰り返し可能な性能を提供します。
サポート抵抗力(1.0 PF)そして抵抗 + 感導 (0.8 PF)操作。
モーター,変圧器,誘導負荷の現実世界の電気特性をシミュレートするのに最適です.
ユーザーがシステムの安定性,パワー要因,電圧調節を現実的なストレス条件下で分析することができます.
出力精度まで±0.5%信頼性の高い試験結果を保証します。
段階的な負荷制御は,徐々に安全な電力のランプを可能にします.
継続的な監視電圧、電流、力、およびPF正確なデータ収集
統合された保護:過負荷、過温、短路そして、fan failure alarm.
Modular resistor and inductor assemblies simplify inspection and service.
Compact cabinet design suitable for laboratory, plant room, or field testing environments.
High-efficiency air cooling system maintains stable operation under continuous load.
オプションremote monitoring system for data acquisition and real-time control.
Intuitive control interface with touch screen or switch panel.
Supports parallel operation with other load banks for expanded capacity.
| パラメータ | 仕様 |
|---|---|
| 評価された力 | 200キロワット |
| 評価電圧 | 380 V AC, 3-phase |
| パワーファクター | 1.0 (resistive) / 0.8 (inductive) |
| Load Step | Customizable (e.g. 5 kW or 10 kW per step) |
| Accuracy | ±0.5% |
| Cooling | Forced air cooling |
| 保護 | Overload, over-temperature, short circuit |
| Operating Temperature | –20 °C to +50 °C |
| Enclosure | Indoor/Outdoor, IP54 |
| 制御モード | Local / Remote |
| Data Interface | Optional RS485 / Ethernet / MODBUS |
Generator commissioning and performance validation
UPSとインバータのテスト in data centers and telecom facilities
Periodic maintenance to prevent generator wet stacking
Marine power system simulation and verification
Load sharing and synchronization tests for parallel generators
Factory acceptance tests (FAT) and on-site commissioning
Comprehensive testing for both real and reactive load performance
Improved power factor analysis for optimizing generator performance
Enhanced safety through automated protections and precision control
Global standard compliance (IEC, GB, ISO) ensuring international reliability
Engineered by professionals with years of expertise in load testing and power simulation
According to recent industry reports, the global load bank market is projected to grow from USD 288 million in 2024 to USD 387 million by 2032, driven by the expansion of data centers, renewable energy systems, and industrial backup power solutions.
The demand for resistive-reactive load banks is especially increasing, as more users seek to replicate realistic electrical environments for accurate generator and UPS testing.
This market trend highlights the value of GROADA’s advanced RL load bank solutions, which combine high precision, flexible configuration, and durable performance for modern power infrastructure projects.
Connect the load bank to your generator or UPS system securely.
Perform no-load checks for voltage and frequency stability.
Gradually apply load steps (resistive or inductive) up to the desired level.
Monitor system response — voltage, current, PF, and temperature.
Record test data for analysis and maintenance documentation.
After testing, reduce load to zero and allow cooling fans to run for several minutes.
Inspect components before disconnecting and storage.
Over 10 years of engineering expertise in power testing equipment
Customizable solutions from 10 kW to 5 MW load capacity
Exported to over 50 countries worldwide
Supported by a dedicated technical and after-sales service team
Proven reliability in harsh industrial and offshore environments
GROADA’s mission is to provide trusted and innovative load testing solutions that ensure safety, stability, and efficiency for global power systems.
Q1: What does RL mean in load banks?
RL means 抵抗性 + 感導性. It combines resistive elements that draw real power (kW) and inductive coils that draw reactive power (kVAR), simulating real-world electrical loads with lagging power factor.
Q2: Why is reactive load testing important?
Reactive testing helps evaluate generator voltage regulation, power factor correction capability, and transient response — critical factors for reliable system operation.
Q3: Can GROADA RL load banks operate outdoors?
Yes, optional weatherproof enclosures (IP54/IP55) make them suitable for outdoor or mobile applications.
Q4: Can multiple load banks be paralleled?
Yes, GROADA RL load banks can be connected in parallel to achieve higher power capacity or multi-system testing.
Q5: How often should load bank testing be done?
Industry best practice recommends at least once a year for standby generators or UPS systems to ensure reliable performance and avoid carbon buildup.
GROADA is a professional manufacturer of industrial load banks and power testing equipment.
We specialize in resistive, inductive, capacitive, and combined load banks from 10 kW to 5 MW, serving industries such as energy, telecom, marine, and manufacturing.
Our products are exported globally and recognized for quality, durability, and engineering precision.
Every GROADA load bank is designed to meet international standards (IEC/GB) and undergoes strict factory testing to ensure optimal performance.