GROADA-AC220V-15KW-RLC Banco de carga fabricante
The GROADA AC220V 15KW RLC Load Bank is engineered to provide comprehensive simulation of real-world...
| Modelo | AC220V-10KVA-RLC | AC380V-30KVA-RLC | AC380V-60KVA-RLC | AC380V-100KVA-RLC | AC380V-200KVA-RLC | AC380V-300KVA-RLC |
| Potência nominal | RLC = 10KVA | RLC = 30KVA | RLC = 60KVA | RLC = 100KVA | RLC = 200KVA | RLC = 300KVA |
| R = 10KW; L = 10KVA C = 10KVA | R = 30KW; L = 30KVA; C = 30KVA | R = 60KW; L = 60KVA; C = 60KVA | R = 100KW; L = 100KVA; C = 100KVA | R = 200KW; L = 200KVA; C = 200KVA | R = 300KW; L = 300KVA; C = 300KVA | |
| Outro poder pode ser personalizado de acordo com os requisitos | ||||||
| Tamanho (largura * profundidade * altura mm) | 500*750*1400 | 600*850*1500 | 1000*1100*1500 | 1100*1600*1500 | 1500*1800*1800 | 2000*2000*2000 |
| Peso | 120 quilos | 380 quilos | 580 quilos | 880 quilos | 1500 quilos | 2500 quilos |
| Tensão de entrada | AC220 / 230V | AC380 / 400V | ||||
| Outra tensão de entrada pode ser personalizada de acordo com os requisitos | ||||||
| Corrente de entrada | 0-45A | 0-45A | 0-90A | 0-150A | 0-300A | 0-450A |
| Carga mínima | R = 100W; L=100VA; C = 100VA | R = 100W; L=100VA; C = 100VA | R = 100W; L=100VA; C = 100VA | R = 100W; L=100VA; C = 100VA | R = 1KW; L = 1KVA; C = 1KVA | R = 1KW; L = 1KVA; C = 1KVA |
| Outra potência mínima de carga pode ser personalizada de acordo com os requisitos | ||||||
| fator de potência | PF = 0,1 ~ 1,0 (outro fator de potência pode ser personalizado de acordo com os requisitos) | |||||
| Precisão geral | 3% (outros requisitos de precisão podem ser personalizados de acordo com os requisitos) | |||||
| Modo de controle | Manual local / computador anfitrião remoto (modo de controle manual local: interruptor / botão / tela táctil trivial opcional, outros métodos podem ser personalizados conforme necessário) | |||||
| Interface remota | RS232/RS485/USB/RJ45/CAN/GPIB (outros modos de interface podem ser personalizados de acordo com os requisitos) | |||||
| Função de proteção | Proteção de parada de emergência, proteção contra sobretemperatura, proteção contra bloqueio de carga do ventilador, proteção contra a terra (selecione proteção contra sobretensão, proteção contra sobrecorrente, proteção contra curto-circuito, sobrecarga do ventilador, volume de ar insuficiente) | |||||
| Fonte de alimentação de trabalho | AC220V | AC220V / 380V | AC380V | |||
| Precisão da exibição | 0,5 nível (outra precisão explícita pode ser personalizada de acordo com os requisitos) | |||||
| Parâmetros de exibição | Tensão, corrente, potência, frequência, fator de potência, etc. (outros métodos explícitos podem ser personalizados de acordo com os requisitos) | |||||
| Frio certa maneira | Entrada de ar lateral e saída de ar superior (outros métodos de saída de ar podem ser personalizados de acordo com os requisitos) | |||||
| Nível de proteção | IP20 (outro nível de proteção pode ser personalizado de acordo com os requisitos) | |||||
| cor da aparência | RAL7035 (outras cores podem ser personalizadas de acordo com os requisitos) | |||||
| Temperatura de trabalho | -10 ℃ ~ 55 ℃ | |||||
| Umidade relativa | ≤95%RH | |||||
| Altitude | ≤ 2500 m | |||||
O banco de carga GROADA RLC é uma solução de ponta projetada para testes rigorosos de sistemas de energia elétrica. Simulando com precisão cargas resistivas (R), indutivas (L) e capacitivas (C), este banco de carga fornece uma representação realista das condições operacionais do mundo real. É uma ferramenta essencial para engenheiros, técnicos e gerentes de instalações que buscam garantir a confiabilidade, eficiência e segurança de geradores, sistemas UPS e outros equipamentos de energia crítica.
No cenário energético em rápida evolução de hoje, onde a integração renovável, a infraestrutura crítica e a automação industrial exigem eletricidade estável e confiável, o banco de carga GROADA RLC oferece precisão, versatilidade e conformidade com padrões globais.
O banco de carga GROADA RLC pode aplicar simultaneamente cargas resistivas, indutivas e capacitivas. Isso garante que os sistemas de energia sejam testados em condições que imitem de perto ambientes operacionais reais, incluindo cargas flutuantes, armônicos e fatores de potência variados.
Os sistemas elétricos modernos exigem testes de carga flexíveis. O banco de carga GROADA permite ajustes de fator de potência de 0,1 a 1,0, permitindo a avaliação do desempenho do sistema sob fatores de potência de atraso, liderança e unidade. Isso é particularmente crucial para equipamentos industriais, sistemas UPS e fontes de energia renováveis.
Projetado para aplicações globais, o RLC Load Bank suporta sistemas AC monofásicos e trifásicos:
Single-phase: 120V, 220V, 230V, 240V (50/60Hz)
Three-phase: 208V, 380V, 400V, 415V (50/60Hz)
This makes it suitable for international deployments across data centers, industrial plants, and telecommunication facilities.
Equipped with high-precision digital meters, the load bank monitors:
Voltage and current
Active, reactive, and apparent power
Power factor
Energy consumption
Frequência
These real-time measurements allow engineers to make informed decisions and validate system performance accurately.
The GROADA RLC Load Bank offers both local and remote control:
Local Operation: Intuitive touchscreen interface for easy load adjustment.
Remote Operation: Full computer-based control for monitoring, scheduling, and data logging, improving operational efficiency and safety.
Resistive load accuracy: ±5%
Inductive and capacitive load accuracy: ±10%
These specifications guarantee precise load application, ensuring test results are reliable and reproducible.
The GROADA RLC Load Bank is widely used across multiple sectors:
Uninterrupted power is critical in data centers. The RLC Load Bank allows operators to test backup generators and UPS systems under full-load conditions, ensuring seamless operation during power outages.
Telecom facilities depend on emergency power systems for network continuity. The load bank enables rigorous testing of power infrastructure, preventing service interruptions and safeguarding critical communication lines.
Production lines and heavy machinery rely on stable power. The GROADA load bank evaluates system robustness, identifies weaknesses, and minimizes downtime risks, ultimately protecting operational continuity and revenue.
Mission-critical operations require power systems that perform flawlessly under extreme conditions. The RLC Load Bank validates generators, UPS, and control systems, ensuring readiness in defense and aerospace applications.
As solar, wind, and hybrid energy solutions grow in adoption, testing their interaction with grid systems becomes essential. The RLC Load Bank simulates variable loads to evaluate system stability, voltage regulation, and power factor correction.
The GROADA RLC Load Bank adheres to globally recognized standards:
IEEE 1547: Distributed energy resource interconnection and performance testing.
IEEE 112.3 & 112.5: UPS performance verification standards.
NFPA 110: Emergency and standby power system testing and maintenance.
ISO 8528: Reciprocating engine-driven generator testing procedures.
IEC 62040: Performance and test requirements for UPS systems.
UL 1008: Safety requirements for transfer switches.
These certifications ensure that testing meets regulatory requirements, enabling safe deployment in diverse industries worldwide.
By simulating real operational loads, potential weaknesses in generators, alternators, batteries, and control panels are detected before they cause system failures.
Proactive testing reduces unexpected maintenance costs and extends equipment lifespan by identifying issues early.
Regular load testing ensures uninterrupted power supply, critical in healthcare, data centers, and telecom facilities.
Meeting ISO, IEEE, NFPA, and UL standards ensures organizations maintain compliance and safety across all operations.
By preventing downtime and optimizing power system performance, organizations save on energy costs, maintenance expenses, and emergency repair charges.
| Parâmetro | Especificação |
|---|---|
| Tipo de carga | Resistive, Inductive, Capacitive |
| Fator de potência | 0.1 – 1.0 Adjustable |
| Tensão | Single-phase 120V/220V/230V/240V, Three-phase 208V/380V/400V/415V |
| Frequência | 50/60Hz |
| Measurement Accuracy | ±5% R, ±10% L/C |
| Controle | Local touchscreen, Remote computer control |
| Dimensões | Customizable per model |
| Refrigeração | Forced air or natural convection options |
| Características de segurança | Overload protection, emergency stop, thermal sensors |
GROADA has decades of experience in designing and manufacturing load banks trusted by industries worldwide. Our products are:
Reliable: Engineered for precision and long-term durability.
Flexible: Suitable for a wide range of power systems and international voltage standards.
Safe: Compliant with global electrical safety standards.
User-Friendly: Advanced digital interface for easy monitoring and control.
Organizations from data centers to military bases rely on GROADA load banks to validate and maintain their electrical systems efficiently.
In an era where uninterrupted power supply is mission-critical, the GROADA RLC Load Bank provides unmatched precision, versatility, and reliability. By simulating realistic electrical loads, it ensures that generators, UPS systems, and industrial power infrastructures operate optimally under any condition.
Elevate your power testing capabilities with GROADA – the professional choice for engineers and organizations that demand accuracy, safety, and performance.