About

Portable Load Bank for Generator Testing and Power System Validation

★★★★★
Main Products:
  • AC Load Bank : R / RL / RLC / RCD
  • DC Load Bank : DC5V - 2000V, 0A - 5000A

Portable load banks are essential tools for testing the performance, reliability, and safety of electrical power systems—including generators, UPS units, and renewable energy sources such as wind turbines or solar farms. These devices simulate real-world electrical loads to verify that a power source can deliver consistent voltage, frequency, and power output under varying conditions. As per IEC 60034-1, electric motors and generators must undergo load testing to ensure operational compliance with international standards before deployment. A well-designed portable load bank allows engineers to conduct factory acceptance tests (FAT), commissioning checks, and preventive maintenance in both industrial and remote locations.

Resistive load banks are the most common type, offering stable, linear load characteristics suitable for testing active power capacity. Reactive load banks introduce inductive or capacitive reactance to assess reactive power handling—critical for grid-connected systems where power factor management matters. Advanced models combine resistive and reactive elements (RLC load banks) to replicate complex real-life scenarios, such as those found in microgrids or data centers. Modern portable units often include digital controls, remote monitoring via Modbus or Ethernet, and thermal protection systems that prevent overheating during extended operation.

Key technical parameters include rated power from 5 kW up to 2,000 kVA, three-phase capability, adjustable power factor (typically 0.1–1.0), and IP54 or higher ingress protection for outdoor use. Cooling methods range from forced air to liquid-cooled designs for high-duty-cycle applications. Units meet CE, UL, and CCC certification standards for global market access. In one anonymized case study, a 1 MW diesel generator was tested using a portable resistive load bank at 80% full load for 4 hours; results confirmed stable voltage regulation within ±2% and efficient fuel consumption across all phases—validating its readiness for critical backup duty.

Portable Load Bank for Generator Testing and Power System Validation-1

For professionals involved in power system design, maintenance, or project commissioning, choosing a reliable, accurately calibrated load bank ensures not only equipment longevity but also compliance with utility interconnection requirements.

Our Product